Construction is moving right along!  Both houses are closed in, roofing is almost done, window and exterior door installation is underway.  At the same time the “rough-in’s” for electrical, plumbing and HVAC (heating, ventilation and air conditioning) are in progress by our licensed sub-trades, each of whom specialize in their specific area of expertise.  Window and door capping has begun on one house, see second picture, as has insulation and drywall; cabinetry has been designed and ordered.  Take a look at the exterior of both houses….

Consturction Continues     Window and Door Trim

The Municipality has connected water and sewer, Hydro One has connected hydro to one house, just waiting for the hydro hook up to the other and for Enbridge Gas to complete the gas hook up to both.  Stay tuned…..